Shingle Roofing Process
Conversion of Shake Roof to Composition
Shingle
The Start

|
Removal of Old Roof
The wood shake roof which is brittle, energy inefficient and flammable is removed.
|
Safety and Debris Collection
Work is completed from the top down to minimize debris entering the interior space while maintaining a solid surface for our workers. Old material is rolled as much as possible to help prevent materials from being scattered around the home.
|
Final Tear-off
Only the original skip sheathing is left in place.
|
Sheathing the Roof
The use of quality plywood, as opposed to OSB, results in a more dimensionally stable and water resistant substrate.
Dimensionally stable, ventilated, and sheathed with QUALITY plywood.
|
Material Delivery
Materials are schedule for roof top delivery when possible to increase efficiency and minimize potential damage to your grounds. Seen below are roofing felts ready for application.
|
Leak Barrier
The leak barrier is being applied in the following pictures.
|
Felt
30 lb. roofing felt is applied.
|
Ventilation
The ridge is cut to allow ventilation and cobra vents are installed
which prevents insects from entering while allowing for adequate
exhaust.
|
Job Completed!
Our roofers celebrate after a job well done!!!
|
|