|
Armstrong Commercial Painting
Armstrong has been
painting Bay Area businesses for over 40 years. Our success has
come from experience and determination, moving us away from standard
paints to *AWS Specified Formulations. Along with meticulous preparation
and attention to detail, Armstrong and our Titanium Packed Paints
give you and your home the most protection, as well as one of
the most comprehensive warranties available.
*AWS: The Armstrong WeatherGuard System (AWS) is the Application, Warranty, and Specification of materials by Armstrong
Interior Commercial Painting Process:
-
El Cerrito Grocery
Featured Commercial Interior
Painting Project |
 |
|
 |
|
 |
Use drop cloths or appropriate floor covering such as plastic
or construction paper for floor protection.
- Plastic sheeting placed over interior furniture,
equipment or other assets as necessary for protection against
possible paint splatter.
- Dusting and removal of surface dirt prior
to priming.
- Patch small holes, cracks, caulk around windows
and doors with appropriate patching and caulking compound.
- Major cracks repaired with AWS compound and
dry wall tape if required.
- De-glossing of enamel surfaces prior to painting,
T.S.P. or AWS equivalent as required.
- Prime and neutralize bleed-through trouble
spots as needed.
- Apply AWS top coat, latex or alkyd base until
coverage obtained (this step as well as all other steps which
are stated as may be necessary or needed to be determined by
visual inspection of Armstrong's foreman).
- Sanding as necessary of all moldings, trim,
doors prior to top coat.
- Apply with a brush, roller or spray to be determined
by Armstrong's Certified Installer.
- Cleanup and removal of materials and debris.
Touch up materials of each topcoat color left on site.
- Interior Painting by Armstrong warranteed
5 years against chipping, peeling, flaking due to defect in
Armstrong's application or materials. (See contract for complete
warranty)
Exterior Commercial Painting Process:
- Perform Lead Based Paint Screening Survey on structures built prior to 1979.
- Hydrowash exterior of building to remove dirt/debris.
Mildew wash if necessary.
- Check for popped nails and re-nail if necessary.
- Wirebrush, scrape or sand wood, stucco and trim as necessary to remove loose material.
- Patch cracks and voids in stucco and wood walls as necessary to make less visable.
- Apply AWS* flexible elastomeric caulk around openings as necessary to seal around doors and windows.
- Remove and replace any loose glazing putty materials in wood windows. Prime as needed.
- Apply wood conditioner to weathered wood as needed. Apply rust converter to exposed rusted ferrous metal as needed.
- Apply AWS* sealer and/or primer as necessary to building.
- Apply AWS* top coat and/or elastomeric coating
to walls and AWS*.
- Armstrong will clean up property on a daily basis. Order of work may vary depending on job specifics.
Click
Here to find out more or call 877-777-1234 and ask to
speak to one
of our representatives.
With Armstrong, it’s that easy!
|